B4 Soffit Fix Anchor

The ACS B4 Soffit Fix Anchor is used in conjunction with One Way (OWT) and Two Way (TWT) ties to tie the inner and outer leaf to structural steelwork or concrete where a movement joint is required. It provides lateral restraint while allowing vertical movement. The anchor is positioned within the cavity and fixed through two 7mm or 10mm holes to the underside of the structure, with sliding ties positioned to suit the wall coursing.

B4 stem individual
B4 Stem
b4 Category

Key Specification Details

  • Used with One Way (OWT) and Two Way (TWT) sliding ties
  • Provides lateral restraint while allowing vertical movement at a movement joint
  • Fixed through two 7mm or 10mm holes to the underside of the structure
  • Manufactured from Grade 304 stainless steel
  • Maximum applied load of 1.5kN, based on the first tie within 75mm of the top of the stem
  • Range of standard sizes available, with bespoke manufacture to suit customer requirements
Blue ACS logo

Want to learn more about our B4 Soffit Fix Anchor?

Specifying a movement joint detail for your project? Share your cavity size and structure type with our Technical Engineering Team and we’ll confirm the right anchor and tie arrangement.

Get in touch

More Than a Manufacturer. A Compliance Partner.

Every ACS customer benefits from ACS Assured – our framework built on three pillars: Compliance Through Expertise, Assurance Through Transparency, and Performance & Innovation. From Gateway 2 documentation to full product traceability and sustainable manufacturing credentials, it’s built into everything we supply.

Award ribbon and check mark icon representing compliance
Compliance Through Expertise
Balance scales icon representing assurance
Assurance Through Transparency
Light bulb and gear icon representing innovation
Performance & Innovation
Presenter delivering an ACS CPD session to a seated audience, with the RIBA CPD assessed material mark

Restraint Tie and Fixings CPD

ACS runs a CPD Certified session on Restraint Ties and Fixings, hosted by Paul Ruding, Strategic Specification Director, covering brick to block ties for high rise buildings, the impact of light gauge steel frames, brick tie channel systems including FrameFix, correct material specification, and stone tie system options. Paul also shares independent Sandberg research on the correct specification and installation of brick tie channel systems.

Available online or in person. Book your place, or get in touch to arrange a session for your team.

Tested, Certified, Trusted

The ACS B4 Soffit Fix Anchor is independently Lucideon tested, with embedment end capacities of 4171N in compression and 4314N in tension, and is manufactured throughout from Grade 304 stainless steel.

Lucideon logo

Technical Data Sheet

The ACS B4 Stem Technical Data Sheet covers the product summary, tie connection performance, and fixing conditions.

FAQs

When is a B4 Soffit Fix Anchor used?
It’s used wherever a movement joint is required, tying the inner and outer leaf to structural steelwork or concrete while allowing vertical movement and providing lateral restraint.

The B4 Anchor is designed to service a maximum applied load of 1.5kN, based on the first tie being positioned within 75mm of the top of the stem.

A minimum mortar class of M2 (iv) is required, with a minimum mortar joint width of 10mm.
The anchor is used in conjunction with One Way (OWT) and Two Way (TWT) sliding ties, positioned to suit the wall coursing.